Grid Flexibility

Grid Flexibility

10X the amount of DER that can safely and reliably interconnect to your feeders with our Flexible DER Enablement solution. 

Instead of capping DER based on traditional feeder peak-load limits, unlock full customer participation — including data centers and Bring Your Own Capacity (BYOC) customers with on-site generation — by connecting them directly to the substation for active grid flexibility. 

The CALM Power Broker dispatches both supply and demand response through scalable, automated flexible contract commitments and real-time interoperability with smart-node interoperability. We deliver a complete turn-key onboarding and integration process for all customer DER and BYOC resources, slashing interconnection costs and complexity while ensuring reliable, ongoing, and scalable interoperability with every distributed energy resource on your system.


Key Features

  • Enforceable ‘flexible interoperability’ contracts, based on augmented tie-flow planning constraints
  • Sign-up of DER via machine-to-machine or human-to machine
  • Grid protection features as part of contracts
  • Enforcement of customer import and export caps
  • Grid edge control interface for scheduling, dispatch, visibility and data collection
  • Integration point for DER assets to CALM Power Broker
  • Deliver schedule control (to owner, OEM or utility schedule)
  • Interface and protocol options to DER control systems
  • Standalone local control and remotely managed controls
  • Deployable grid edge computing or control devices 
 


Simplicity in digital contracts

1. Demand and supply flexibility rules
2. Grid protection definitions and rules 
3. Enforce customer export caps 
4. Allow customers to exceed export caps for customer dollar benefits when grid allows

Augmented grid planning

Provide your transmission and distribution planners with the tools they need to augment their planning process to enable flexible contractually obligated DER import and export caps based on reliability.


Import and Export Flexibility and Caps


Automated Sign-up to contract 'Flexible Interoperability'


Augmented grid planning based on contracts


Non-firm Interoperability Bounding

For more detail see our U.S. Patent #8,521,337